Renovation & Construction

What has already happened:
- Removal of 10,000 gallon fuel oil storage tank in front of Andrews Hall.
- Wood sidewalk constructed behind Andrews Hall.
- Constructed temporary office for Dr. Willingham.
- Jackhammered and removed existing kitchen floor slab.
- Completed selective separation of old Nursery area from existing building.
- Started layout of two new bathroom areas inside Andrews Hall.
- Completed exterior demolition on east side of Andrews Hall in new Ground Floor and First Floor bathroom areas, started layout and mechanical/electrical rough-ins.
- Completed removal of Silas Andrews marble plaque and cross at entrance and placed in storage.
- Completed all asbestos abatement work in old nursery rooms, bathrooms, and at exterior soffits.
- Construction barricades for dust and sound installed throughout interior of Andrews Hall. Masonite surfacing has been added for smoother texture.
- 1940 cornerstone has been removed and will be re-installed later.
- The ramp for the Mechanics Street entrance to Andrews Hall is finished. This is now the only entrance from that side of the building.
- Tree removal is finished for now. A few other trees will be removed later.
- Completion of emergency exit from top floor of Andrews Hall.
- Nursery has moved to Andrews Hall, Room 104 (AH-104).
What will happen next:
- Complete utility pipe tunnel in kitchen/Fellowship Hall area.
- Continue excavation for building additions along Mechanics and Church Streets.
- Continue with re-construction of new bathroom facilities inside Andrews Hall.
- Start plumbing and electrical rough-ins in both new bathrooms.
Questions?
- Speak with any staff member or pastor or call the church office. We want to keep you fully informed as we move through this exciting venture!
|
Wednesday, 21 October 2009 13:10
Renovation & Construction
After a successful capital campaign this spring, the Renovation & Construction committee is hard at work obtaining necessary approvals, permissions and estimates in order to proceed with DPC's Master Facility Plan. The committee is currently in the process of looking over the credentials and histories of contractors, moving toward a decision that will bring us one step closer to breaking ground.
Renovation & Construction
Date
|
Description
|
Docs
|
| 4.30.2010 |
BTG Anniversary Celebration Newsletter |

|
| 2.07.2010 |
Congregational Meeting Handout
The DPC Project Communicator
|


|
|
11.22.2009
|
During the education hour, the Renovation and Construction Committee gave an update to the congregation on all the advancements made with permits, plans and personnel. Click the link to the right to view the PowerPoint presentation.
|

|
|
Comments from the meeting |
 |
|
2.1.2009
|
At the Congregational Meeting on February 1, 2009, DPC's congregation passed the following two motions:
- To approve Phase One of the Master Facility Plan as presented
- To proceed with a capital campaign in the spring of 2009 to help fund Phase One of the Master Facility Plan
|

|
|
11.23.2008
|
The Renovation and Construction Committee of the Session held several conversations with the congregation to begin discussing what might be the first phase pursued in bringing the Master Facility Plan to fruition. Below is information from those sessions along with other materials related to this project.
|
|
|
Comments from the meetings
|

|
|
Bridge renderings
|

|
|
PowerPoint presentation
|

|
|
8.2008
|
In September, the Session received the report from our consultant on the listening sessions which occurred at DPC during August. Those gatherings were a time for our members to reflect together on the Master Facility Plan approved by the congregation in May and discuss next steps. A copy of the report can be viewed via the link to the right.
|

|
|
5.18.2008
|
Master Facility Plan proposal
|

|
|
DPC Project Communicator
|

|
|
4.6.2008
|
Handout - Costs
|

|
|
Handout - Plans
|

|
|
Comments from the meeting
|

|
|
2.10.2008
|
PowerPoint presentation
|

|
|
Comments from the meeting
|

|
|
1.13.2008
|
PowerPoint presentation
|

|
|
Comments from the meeting
|

|
|
|
|
|
|